Running on ABS deuterium, gradually increasing ring fill current from 150 
to 200 mA.  Target thickness is lower than we'd like, as Genya did not take 
the time to align the nozzle after the old 15 mm cell was installed.  He 
will take that time tomorrow (needs BLAST on).  Then Michael will work on 
lead-glass cabling in the pit (needs BLAST off).  After that, Genya will 
likely work on the ABS transitions, as the polarization still looks 
low.  The first runs after LTOF15 was fixed give hPz~0.29 for 1.7 kC.  For 
the ep, we can probably use all the runs taken since Saturday, since hPz is 
calculated for low Q2.  Pzz (from ed) needs LTOF15.
        We will also fill the solenoids, and investigate a missing BATS ADC (right 
0 bottom, I think, probably only need the D Tunnel).
        Expect the nozzle to freeze late this week.  When that happens, we'll run 
empty target while the nozzle thermally cycles.
                                        Karen (for Doug)
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST